Contract furniture · Ningbo, China

Furniture manufacturing and quality control in Ningbo

STENTOR furniture is supported by production bases in Zhenhai and Xiangshan. The documented scope covers office, hotel, apartment, school, care, public-space and residential furniture design, production and service.

Zhenhai base in use
Zhenhai · 2003
Xiangshan base in use
Xiangshan · 2022

01

A controlled project workflow

  1. Brief and room data review
  2. Drawings and material schedule
  3. Prototype or sample development
  4. Sample approval and specification freeze
  5. Production and in-process checks
  6. Final inspection, packing and shipment

02

Materials and finishes

The supplied company profile references engineered panels, timber, metal, upholstery and water-based coating processes. Exact grades, emissions, hardware and finish performance are confirmed in the project material schedule.

03

Quality checkpoints

A project quality plan can connect incoming material checks, first-article confirmation, in-process inspection and final packing review. Inspection records and acceptance criteria should be agreed before production.

Manufacturing

Two production bases in Ningbo

The company profile identifies manufacturing bases in Zhenhai and Xiangshan. Published management-system certificates cover a broad furniture design, production and service scope.

The supplied company profile references engineered panels, timber, metal, upholstery and water-based coating processes. Exact grades, emissions, hardware and finish performance are confirmed in the project material schedule.

Final inspection, packing and shipment

Final inspection, packing and shipment

A project quality plan can connect incoming material checks, first-article confirmation, in-process inspection and final packing review. Inspection records and acceptance criteria should be agreed before production.

Confirmed for each project

Published management-system certificates

ISO 14001:2015 · Published management-system certificates

ISO 14001:2015

Environmental management for furniture design, production and service

Valid through 2027-05-30

ISO 45001:2018 · Published management-system certificates

ISO 45001:2018

Occupational health and safety management for furniture design, production and service

Valid through 2027-05-30

Certificate status is based on the supplied qualification file. Buyers should request current verification during due diligence. · 2025-03-06

A controlled project workflow

Brief and room data review · Drawings and material schedule · Prototype or sample development · Sample approval and specification freeze · Production and in-process checks · Final inspection, packing and shipment

Quality checkpoints

A project quality plan can connect incoming material checks, first-article confirmation, in-process inspection and final packing review. Inspection records and acceptance criteria should be agreed before production.

Materials and finishes

The supplied company profile references engineered panels, timber, metal, upholstery and water-based coating processes. Exact grades, emissions, hardware and finish performance are confirmed in the project material schedule.

Contact sales